    Quote Originally Posted by ctzn-Ed View Post
    It was mentioned already a few times; the drawings are being redone. It is still a go until the fadd lady sings. This is construction and 6 months/year is a minor delay. If all the materials, currently on ground elevation, is cleaned up and removed, i will feel a little nervous. This tower will indicate the status of our true economic rebound.
    Right. At JW's top off ceremony, the vice president of Katz Real Estate basically stated that work would resume in two to three months because of design changes. I'd rather have a delay than a cancel or a stale proposal any day.
    Skyscraper Enthusiast

  2. #1202
    C2E Long Term Contributor
    Join Date
    Feb 2006
    Location
    Downtown Edmonton
    Posts
    45,887

    Default

    Correct. Hearing steel end of summer.
    www.decl.org

    Ottawa-Edmonton-Vancouver-Edmonton

  3. #1203

    Default

    Exactly! The general mass can't comprehend to the complexity of just redoing a drawing
    It is not a 1 or 2 days and here you go sir... the drawings has to be done for all trades required for that structure.
    " The strength of a man is in the stride he walks."

Page 13 of 13 FirstFirst ... 3910111213

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •